Coworking Hub

GDH Bay City Centre 粵海金融中心

  • Office Building
  • 21 Zhujiang West Road, Huangpu West Avenue
  • Zhujiang New Town CBD
  • Guangzhou

GDH Bay City Centre 粵海金融中心

  • Office Building
  • 21 Zhujiang West Road, Huangpu West Avenue
  • Zhujiang New Town CBD

GDH Bay City Centre 粵海金融中心

  • Office Building
  • 21 Zhujiang West Road, Huangpu West Avenue
  • Zhujiang New Town CBD
  • Guangzhou

GDH Bay City Centre is a prominent mixed-use development located in the heart of Guangzhou's Zhujiang New Town. This complex integrates top-tier commercial office and retail facilities within a garden-like urban environment, covering an area of approximately 300,000 sq.m. It consists of two international Grade A office towers and eight standalone garden-style commercial buildings, interconnected by green corridors that link to the city's new central green belt. Strategically positioned within the Greater Bay Area's development ecosystem, it is situated in the highly sought-after Zhujiang New Town core business district, which hosts a concentration of high-end industries, including finance and technology, facilitating the creation of a one-hour economic, business, and living circle among Guangdong, Shenzhen, Hong Kong, and Macau. The premises boasts excellent transportation links and a vibrant commercial atmosphere, with easy access to K11 and Tianhuan shopping centers, as well as five-star hotels like the Grand Hyatt and Guangzhou W Hotel, making it an ideal choice for office, business reception, and leisure activities. GDH Bay City Centre has achieved LEED-CS Gold pre-certification and aims for LEED-EB Platinum standards, emphasizing energy efficiency, ecological office concepts, and the integration of nature. Notably, 75% of the roof utilizes high-reflectivity materials, and 75% of common areas benefit from ample natural light. The project also focuses on water resource recycling, employing devices to control landscape irrigation and utilizing rainwater harvesting, along with innovative wastewater treatment technologies. For air purification, PM2.5 sensors are installed indoors and outdoors, while the underground parking and office areas feature intelligent ventilation systems equipped with CO and CO₂ concentration sensors, further enhancing air quality. The project provides over 5,000 sq.m. of collaborative space, including multifunctional conference centers and sky lounges, catering to the needs of urban elites for work, communication, business negotiations, and relaxation. Additionally, it offers more than 30,000 sq.m. of open commercial village space, featuring sunken plazas, indoor natural walking areas, and rooftop gardens, seamlessly connecting office spaces with leisure environments. Managed by Tianhe City Management in collaboration with Savills, the project delivers international platinum-level property services.

GDH Bay City Centre is a 58-storey double A Commercial Building located at the junction of Zhujiang West Road and Huangpu West Avenue just 5-mins walk from Huangpu Dadao MTR station (Exit A). Grade A buildings like R&F To-Win Building are in its close vicinity.

Its total GFA is approximately 138,000 sq.ft.. It has 18 passenger lifts and 2 cargo lifts.

GDH Bay City Centre is a single ownership Commercial Building with offices available for rent.

Flex and serviced office solution is available from The Executive Centre operating in this building. Click Here for rates and promotional packages.

  • Office
    Type
  • 3 Years
    Age
  • A+
    Grade
Usage Office (For Rent)
No. of Storeys
  • 58 (Above Ground)
Year Completed 2022
Ownership Single Landlord
Total GFA 138,095.00 m²
Typical Floor Area 1,525.00 - 0.00
Air Conditioning
  • Central A/C (V.A.V.)
  • Mon to Fri 08:00 - 18:00
  • Sat 08:00 - 13:00
Management Fee
  • ¥36.00
  • per m²
  • (Last Updated: 2024)
Elevator
  • 18 (Passenger)
  • 2 (Cargo)
Slab-to-slab Height 2.95 (Meter)
Rail Station
  • Huangpu Dadao - Within 5 minutes walk (A Exit)
  • Tiyu West Road - Within 15 minutes walk (H Exit)
  • Zhujiang New Town - Within 15 minutes walk (D Exit)
Carpark (Inhouse)
  • Open to Public
  • Monthly : 2400 (Fixed) / 1800 (Floating)
  • Hourly
Loading & Drop off Facilities
  • Loading/Unloading Area
  • Drive Through Drop off Area
Last Updated 2025-01-09
Ref. B0018110

Customer Service

Gapmen Yip
Gapmen Yip 葉仲民
CoWorking Space Specialist
S-430922

Co-Working Space

Properties Comparison

{{ $jtext._(mode === 1 ? 'COM_HUB_PAGE_RESULT_EMPTY_GENRAL' : 'COM_HUB_PAGE_RESULT_EMPTY_COMPARISON') }}